
Member of the House of Representatives for Itu/Ibiono Ibom Federal Constituency
Constituency projects in Itu/Ibiono Ibom (2024-2025): classroom blocks, civic centres, solar streetlights, Joshua Uwah Street
Projects he lists: a furnished six-classroom block at Technical School/College, Ayadehe; a four-classroom block with toilets at PCN Primary School, North Itam (Itu LGA); a 1.5 km road, Joshua Uwah Street, Mbak Itam III, with solar streetlights and drainage; a 450-capacity civic centre at Idoro and a 1,000-capacity civic centre under construction at Nkwa (Ibiono Ibom LGA); a solar borehole at Afaha Itam; and solar streetlights in several communities. The civil society group CHRAN reported tracking the projects on 4 June 2025 and praised their execution.
- Responsible official: Ime Bassey Okon
Published 20 November 2026 · Last reviewed — not yet reviewed · 3 sources · Request a correction
Official's own claim
This is what the official or their office says. It is recorded as a claim and has not been independently established.
Not verified
We do not yet have enough evidence to back this project. Treat its details as reported, not established.
Timeline
No dated events have been recorded yet.
Key details
- Status
- Status unknown
- Category
- constituency projects
- Location
- Itu and Ibiono Ibom LGAs, Akwa Ibom State
Money
Each figure is shown with its type, period and source. Different stages are never added together.
No financial figures have been documented for this record.

